Baby Chucky Bunny…

It was a White Elephant party weekend and Steve ended up with what I can only describe as a baby-version of Chucky, as a bunny. I think this doll has the scariest face I have ever seen on a child's toy. the photo doesn't quite capture the sneer on it's face. And those are real eyelashes – which somehow makes the whole thing even scarier.

BabyChuckieBunny-02

I had it out when the kids dropped by and Jack fell in love with Baby Chucky Bunny. Lorna and Chris were as put off by it as we were and said it was not going home with them. So Jack put BCB to sleep in the dump truck.  I'm not sure whether to hide it from him (to save for re-white-elephant-gifting) or to let him play with it until it is used up.

BabyChuckieBunny-01

Tulips in the Park & Pool build – day 12

I'd tell you that we are about to send an eNewsletter with new Piece O' Cake news except that I'll bet you get it before you read this. If not, go here to read our new eNewsflash. A big part of it is that Tulips in the Park ePatterns are now available. And we have dots!

Not much has changed pool-wise except that the waterfall is going and the sun came out. I promised pictures and here are some nice detail shots. The little tiles (below) still have a sort of scummy adhesive stuck to them. The guys are going to come clean that off when they seal the deck. I think it needs to warm up for that to happen. They look nice now but I'll bet they seriously sparkle when they are clean.

PoolBuild-85 copy 

PoolBuild-86 copy

Luckily, the plaster has turned out to be an amazing shade of blue. I chose this color from a broken bit that was less than 1" square. There was no way to do a test swatch and no one in town has ever chosen this color. Being a quilter who works with color in little bits helped a lot.

It's funny – you can't guess what the temperature is from these photos and it looks very inviting. But it's below freezing and, trust me, I have no desire to jump in today.

Wallpaper for your computer…

C&T just posted some free computer wallpaper quilts. Click here to go to their blog post. They are easy to download – just click the picture of the quilt (or quilts) that you want. I'm pretty sure you'll want Winter Dance from our book, Once Upon A Season (below)!

Holiday09_POC_1152x864

Pool build – day 11

It looks better with water in it! Of course now I can see how much more needs to be done to "decorate" the backyard. Later.

PoolBuild-81 copy

Here it is from the other side:

PoolBuild-82 copy

The sky was gray today. I'm going to be interested to see what color the water is when the sun is shining.

Pool build – day 10

(If you didn't read the post about the dome going up, read it before you read this one.) Saturday morning, the plaster crew showed up around 9:00. It was above freezing. They worked inside the dome and they warmed up the interior of the dome with a propane torch/heater. You can see the orange part of the flame in the low, center of this photo. I think I would have set myself on fire with that open flame.

PoolBuild-67 copy

They drained the standing water off the bottom of the pool, taped off the tile, and filled all the remaining holes with a quick setting concrete. Then they brought out the plaster gun and started shooting and smoothing the plaster.

PoolBuild-68 copy 

As you can see, we went with a deep blue color.

PoolBuild-69 copy 

These guys know their job. They have skills and were fun to watch. Check out the fancy footwear!

PoolBuild-71 copy

PoolBuild-72 copy 

They got the plaster smooth and dry and started filling the pool. Notice the water bottle taped to the end of the hose to make it float! Low tech, great idea.

PoolBuild-75 copy

As I write this, the dome is off, the crew is gone, and we have two hoses (with bottles) going full strength into the pool. Somewhere around 5:00 a.m. we should have a full pool and be able to turn off the water.

You know, this is day 10 of the actual pool building by the pool building guys. But we only decided to build a pool in September. Today, December 5, we are filling it! Steve and I are amazed at the speed of this project. Not so much amazed that the professionals did it in 10 days – we are amazed that we managed to clear the backyard, move and re-build our fountain, take down and put up a fence, and more. No wonder we are both feeling like we've run a race. But I have to tell you that we both have big grins on our faces tonight!